The Bussang People’s Theatre, a wooden building that has been listed as a “historic monument” since 1996, has evolved over its history. with the expansion of the concert hall and the introduction of new extensions to improve its functionality in accordance with the original vocation.
This intervention, of an estimated duration of 6 months, entirely financed by the State - Ministry of Culture, owner of the premises and contracting authority, for an amount of 1,015,289 euros, aims at the fit-up of the premises of the south wing, and, in the concert hall, floor restoration and accessibility.
Intervention on the south wing
The south wing unites a building under shed built at the beginning of the XXe century to accommodate lodges and a chalet with two levels dating from the 1970s housing the administration offices (floor) and the bar (ground floor).
While maintaining the usual use of the premises, the objective of the work is to improve the interior layout and implement thermal insulation behind a wooden cladding that reflects the spirit of the existing provisions.
Specific facilities and facilities will allow the use of the bar as a venue during the winter period.
Intervention in the concert hall
In the performance hall, work will focus on the restoration of the floor, the revision of existing benches and accessibility through the creation of wheelchair user spaces.
The choice of materials will be carried out in coherence with the existing works and future interventions will preserve the special atmosphere that the conditions of their evolution and the patina of time have given to this high-place of the French theatre, a space for creation and transmission that welcomes professional and amateur actors.
Landlord
State - Ministry of Culture
Contracting authority
Direction régionale des affaires culturelles du Grand Est - Site de Metz
Financing
Status: 100%
Duration
6 months for firm tranche
9 months for the optional tranche
Supervisor
Riccardo GIORDANO - Arch-R Architecture Ltd
Chief Architect of the Historical Monuments 78000 VERSAILLES
Pascal CONILLEAU - cabinet ECOVI
Economist 31250 REVEL
Fabrice LORRAIN - B3E
BET fluids 57000 METZ
SPS Coordinator
Cabinet PREVLOR BTP 54300 LUNEVILLE
Technical controller
VERITAS OFFICES 88190 GOLBEY
Companies
Lot 01: Site installation, cleaning, demolition, earthworks, masonry and concrete
PIANTANIDA SAS 88580 SAULCY SUR MEURTHE
Lot 02: Frame, joinery, cladding and floor
SAS TOITURE DE FRANCHE-COMTÉ 70190 RIOZ
Lot 03: Arrangement
ATELIER DU VIEUX ARMAND SARL 68500 WUENHEIM
Lot 04: Insulation, lining, partition and tile
SARL GALLOIS 88390 LES FORGES
Lot 05: Painting
PAINTINGS MEETING 88150 IGNEY
Lot 07: Electricity, heating and ventilation
SAS SODEL 88101 SAINT-DIE Cedex
Learn more about the People’s Theatre
Virtual tour of the People’s Theatre
Partager la page